Project

General

Profile

2016-11-28.html

Tia Miceli, 12/16/2016 03:23 PM

 
1
<?xml version="1.0" encoding="UTF-8" standalone="no"?>
2
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
3
<html><head><meta http-equiv="Content-Type" content="text/html; charset=UTF-8"/><meta name="exporter-version" content="Evernote Mac 6.10 (454267)"/><meta name="altitude" content="233.6907653808594"/><meta name="author" content="tiamiceli@gmail.com"/><meta name="created" content="2016-11-28 17:02:28 +0000"/><meta name="latitude" content="41.83856387443515"/><meta name="longitude" content="-88.26153367388531"/><meta name="source" content="desktop.mac"/><meta name="updated" content="2016-12-08 19:53:53 +0000"/><title>2016-11-28</title></head><body><div>Bill, Tom, Keith, Xiao, Cory, Carrie, Backfish, Tia, Zarko, Sam, Adrian</div><div><br/></div><div>Booster (Bill):</div><div><ul><li>want to do higher intensity pulses this week</li><li>NuMI want to start slip stacking</li><li>we can have higher flux though increased rep rate, or higher intensity</li><li>RF station work downtime depends: maybe December with other work</li></ul><div><br/></div></div><div>BNB (Tom):</div><div><ul><li>DI bottles replaced last week Friday (one had a leak)</li><li>Need to test rapid trim magnent once MI starts taking protons</li></ul><div><br/></div></div><div>Horn4 (Keith):</div><div><ul><li>parts sent out last week or this week for silver-plating.</li><li>hoping to have it all together before the end of the year.</li><li>have it on testing blocks in MI-12 before power switch in January</li></ul><div><br/></div></div><div>ANNIE (Carrie):</div><div><ul><li>neutron source studies being analyzed</li><li>working on analysis package to check running</li><li>shift training right now</li></ul><div><br/></div></div><div>MicroBooNE (Cory):</div><div><ul><li>Smooth running last week</li><li>Testing single- shifter mode</li></ul></div><div><br/></div></body></html>