Project

General

Profile

2015-11-30.html

Tia Miceli, 10/31/2016 01:03 PM

 
1
<?xml version="1.0" encoding="UTF-8" standalone="no"?>
2
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
3
<html><head><meta http-equiv="Content-Type" content="text/html; charset=UTF-8"/><meta name="exporter-version" content="Evernote Mac 6.10 (454267)"/><meta name="altitude" content="229.0458221435547"/><meta name="author" content="tiamiceli@gmail.com"/><meta name="created" content="2015-11-30 17:03:23 +0000"/><meta name="latitude" content="41.83850410889221"/><meta name="longitude" content="-88.26184864767495"/><meta name="source" content="desktop.mac"/><meta name="updated" content="2016-10-31 18:01:10 +0000"/><title>2015-11-30</title></head><body>
4
<ul>
5
<li> MI access tomorrow afternoon, 4 hours?
6
<ul>
7
<li>May be enough time to get the recycler RF signal on the card in MI12 for the BES trigger</li>
8
<li>check logic on monitoring if we use RWM triggering on same signal.</li>
9
</ul>
10
</li>
11
</ul>
12
<div><br/></div>
13
<ul>
14
<li>Beam on target monitor will be shifted to the correct location by using ACNET devices from Tom. Monitoring page is being updated. Will also include 1-σ. 1D-1F signal difference being examined at the wrong time, so the difference may not be right.
15
<ul>
16
<li>add to some page about not cutting on the for DQM, only for monitoring sustained changes in timing</li>
17
</ul>
18
</li>
19
</ul>
20
<div> </div>
21
<ul>
22
<li>SciBath: Rex. Ran over holiday, test with water wall. See neutrons w/&amp;w/out water wall &amp; w/&amp;w/out concrete wall.</li>
23
<li>ANNIE: working on TSW (technical scope of work) decide what experiment/lab provides</li>
24
</ul>
25
<div><br/></div>
26
</body></html>