Project

General

Profile

wn.txt

Kyle Hazelwood, 01/15/2015 12:00 PM

 
1
Work Notes
2
7/22/11 copied pa1850 to create pa4196 for NR orbit correction
3
7/26/11 changed names of DB tables(to pa4196_x)
4
7/27/11 took out code for DC(Foster method for MI ramp correction)
5
	review 3 bump code and made note. The key routine is b3_tloc that picks the midle of 3 trims
6
	for a given bpm. It identify the trim at the same location by their first 3 characters in
7
	names of trim and bpm. This works OK if all names of trims are 3 characters.
8

    
9

    
10

    
11
6/24/13 Added a waring in  routine c453_grp_init when got h or v correctors number not 104 as expected.
12
The orbit smoothing is not cycle-dependent. 
13
- all events are configured c453 level 1,
14
- use gtable #1
15
- with  a 2-slots gi(g absc p = 0,192 ) table driven by MDAT$30.